You and your team are to prevent soil erosion and silting of waterways.
- Use sandbags, hay bales and other baffles to control water run-off to reduce erosion.
- Where suitable, use mulch to protect disturbed or exposed areas.
- Monitor and maintain erosion and sediment control measures regularly and after rainfall events.
- Don’t remove erosion and sediment control measures until disturbed areas have been stabilised.
- Where possible, plan to progressively stabilise disturbed areas with vegetation during construction. Where necessary stabilisation will be undertaken after works are complete.